履带式打桩机行走优缺点

The pile driver should pay attention to the following points during the piling process to avoid accidents:

  •  
  • 履带式打桩机(以下简称打桩机)的立柱顶部应安装红灯(夜间工作时必须开启),以警示周围人群,建议用户根据实际情况安装。
  •  
  • The top of the crawler piling rig column should be connected with a lightning rod according to the regulations, and the work should be stopped in case of thunderstorm during operation to protect personal and property safety.
  •  
  • When the pile driver is working, the pile driver should be reliably grounded to reduce the risk of personal electric shock.
  •  
  • When the wind force is greater than level 6 during operation, the pile driver should stop the operation, and the oil cylinder should be used as an auxiliary support. If necessary, a wind rope should be added for fixing.When the crawler is piled, avoid the collision between the drill pipe reinforcement cage and other columns.
  •  
  • When the drill pipe or pile is driven into the ground, it is strictly forbidden to move the pile frame.
  •  
  • When the crawler pile driver is drilling, the current of the pile driver's ammeter shall not exceed 100A. If the ammeter current exceeds 100A, the drill pipe should stop and descend slowly, and the rotor always keeps turning. If the current drops below 100 amps and is stable, the drill pipe can continue to decline slowly.
  •  
  • When pulling the pile and pressing the pile, the front part of the pile frame should not be lifted.
  •  
  • In order to accurately align the pile position, the crawler pile frame can be allowed to walk and move the pile position and rotate the mechanism. When the position of the rotating pile frame is not accurate, you can continue to walk back and forth or rotate to ensure accuracy.
分享
slurry pump companies

河北振扬科技有限责任公司专业为全球矿业、冶金、市政建设、电力、疏浚、石化等行业提供渣浆泵解决方案、铸造OEM服务、钻机和钻井工具以及空气压缩机。

Copyright © 2026 河北正阳科技有限责任公司 版权所有。 Sitemap | 隐私政策

tel
mailto
phone
goTop

如果您对我们的产品感兴趣,您可以选择在这里留下您的信息,我们会尽快与您联系。