slurry pump impeller
- Drill Bit The drill bit is specifically designed to handle various rock types. It is typically made from durable materials like tungsten carbide.
El mantenimiento de los chocks es vital para el funcionamiento eficiente de los laminadores. Con el tiempo, el desgaste natural y las condiciones operativas pueden debilitar la estructura de los chocks. Las inspecciones regulares son necesarias para detectar cualquier signo de daño, como grietas o deformaciones. Ignorar el mantenimiento adecuado puede llevar a fallas catastróficas, que no solo provocan tiempos de inactividad prolongados, sino que también pueden resultar en costosas reparaciones y en la pérdida de materia prima.
The main components of submarine hammer drilling equipment include the drill rig, hammer, drill pipes, and the drill bit. The drill rig is often mounted on a surface vessel or a floating platform and is designed to support the excessive weight and dynamic forces encountered during drilling operations.
The innovation behind the ZJ slurry pump lies in its hydraulic design. It is engineered to achieve high efficiency in the transfer of slurries, reducing both energy consumption and operational costs. Available in different sizes and designs, the ZJ pump can be tailored to meet the specific demands of various applications, including dredging, tailings management, and waste handling.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.