peças mecânicas de triturador de titânio
Lastly, advancements in technology and automation are essential for ensuring that the tungsten crusher operates at peak efficiency. Features such as smart controls, monitoring systems, and energy-efficient designs can significantly enhance performance, promoting sustainability while reducing operational costs.
In addition to their durability, rubber-lined pumps are also designed for flexibility and efficiency. They can be customized to suit specific applications, with various types of rubber available to cater to different chemical resistances and temperature ranges. This adaptability makes them a popular choice across numerous sectors, from food processing to petroleum refining.
rubber lined pump

Down-the-Hole Hammer Drilling An Innovative Approach in Mining and Construction
2. Construction and Civil Engineering Heavy slurry pumps are equally important in construction, particularly in the dredging process where materials like sand, silt, and clay are extracted from water bodies. They help in maintaining the flow of materials and can be used in dewatering applications during excavation processes, significantly accelerating project timelines.
እኩል ሆነ፡ የተለያዩ ቅርንት/ምር እንደዚህ ይቀርቡ፡፡ ይህውየኒ ሌዋዬን እንዳንእል ያደርጋለሁ。 ወይዔሪያ ጉኖ ይኖርባቸው ለሚያንዛ ዻይ ይሙይ፡፡ ዕውዴም በይወርዱ፡፡
barras de perfuração de metal duro

- Industrial Applications Facilities that experience high moisture levels or require regular removal of liquids from particular areas benefit from industrial-grade drainage pumps.
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank
(1) When using the drilling rig to drill, the driver should be placed in the drilling position, so that the front end is against the rock, and the distribution should be careful to let the drilling rig move forward, so that the drill bit touches the rock; When opening the hole, first quietly let the drilling rig drive, when the drill rod is in place in the rock, it is allocated to the full open position.
(2) Before starting the drilling rig, check whether the charging pressure of the accumulator is normal; Check whether the scouring water pressure and the lubricating air pressure can be; Check whether there is sufficient lubricating oil in the lubricator, and whether the oil supply is appropriate; Check the reverse tendency of the oil pump motor. (3) If the drilling rig cannot open the hole smoothly, it should first assign the rock drill to retreat, and then let the rock drill move forward to open the hole from the beginning.
(4) When replacing the drill bit, the drill bit should be gently pressed against the rock, so that the motor of the drill can be reversed to complete the sensitive unloading head.
(5) The inspection of hydraulic components can only be prevented under the condition of pole cleaning, and after the connecting tissue is removed, it must be quickly plugged with the cleaning tightly matched plug. Before the repaired rock drill is used from scratch, it is necessary to circulate the hydraulic oil into the oil circuit to wash the components of the hydraulic system.
(6) The oil level and oil supply of the lubricator should be checked regularly; The gear with reverse structure is regularly filled with high-temperature grease; Check the oil level in the lubricating oil tank regularly and remove the dirt in the oil tank